Great Lakes Art Database

Marine Review (Cleveland, OH), August 1925, p. 286

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

286 MARINE REVIEW August, 1925 DIFFERENT STAGES OF CONSTRUCTION OF THE CHANNEL STEEL BARGES BUILDING AT THE ATLANTIC WORKS EAST BOSTON.— UPPER LEFT, SHOWS BOTTOM BUILT OF CHANNELS RIVETED SIDE TO SIDE—THE TWO VIEWS BELOW SHOW SIDES IN PLACE —UPPER AND CENTER RIGHT, GIVE A CLOSE UP OF THE STRUCTURAL FEATURES—LOWER RIGHT SHOWS THREE BAR- GES PRACTICALLY COMPLETED IN DRY DOCK FOR PAINTING AND FINISHING TOUCHES—TAKEN LATE IN JULY

Powered by / Alimenté par VITA Toolkit
Privacy Policy