Great Lakes Art Database

Marine Review (Cleveland, OH), November 1927, p. 6

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

-< Sunk on Superior + When the Steamer W. C. Moreland broke in two on Eagle Point, The American Ship Building Company was naturally called on for this big repair job. The After End Rebuilt Eventually the after end was raised, floated to our Superior dry dock, and thoroughly rebuilt by the men who build ships and therefore know how to repair them. A New Forward End We had the plans and patterns of the Moreland, as we have of most Lake Ships. It was com- paratively easy for us, therefore, to build a new forward end on our Superior ways. “The AMERICAN CLEVELAND Lorain __ Detroir BuFFALO American Ship American Ship Detroit Ship Buffalo Dry Dock Building Co. Building Co. Building Co. Company 6 MARINE REVIEW—November, 1927

Powered by / Alimenté par VITA Toolkit
Privacy Policy