Great Lakes Art Database

Marine Review (Cleveland, OH), May 1929, p. 90

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

The Proof ot the Puddins— Repeat Orders for Sun Oil Tankers built by the Sun Shipbuilding & EDPry Rock Co. IRST CAME the “Sunoco” with four Bessemer Diesel engines. The “Sunoco No. 4” fol- lowed; and then came the motorship “Sun” with Sun-Doxford main engines and two Bessemer 120 H. P. generating sets. Now comes the new 255’ Sun oil tanker with two main engines of 500 H. P. each and two 120 H. P. generating sets—all by Bessemer. And still later will follow the two new 185’ Diesel-electric tankers for the Sun Oil Co.— Bessemer powered—now under way at the Sun Shipbuilding & Dry Dock Co. plant at Chester. ‘Performance Does Count! BESSEMER ENGINE COMPANY 21 Lincoln Avenue ae Grove City, Pa. The new 255’ Sun Oil Co. tanker, now building by theSun Shipbuild- ing & Dry Dock Co. The power plant will consist of 2—500 H. P. Bessemer Diesel main engines and 2—120 H.P. Bes- semer generating sets. EBE SOF VERE DEES EE MAREN E 90 MARINE REVIEW—May, 1929 EFNGENE ©

Powered by / Alimenté par VITA Toolkit
Privacy Policy